Friday, 23 June 2017
3000MM WIDE POLYURETHANE CONVEYOR BELT
Job done in time for Sunday Roast
The teamwork between CCBS engineers and number of various superior contractors was really significant. Huge thanks also to the specially trained outworkers on site operating the CORMAC crane.
The site shutdown was arranged for Saturday and Sunday and although arrangements have been put in place to give our engineers additional 24 hours, we were able to sign off the job in time for Sunday roast! Our aim is always to ensure that your site can run efficiently with minimum downtime.
Supplied and fitted by CCBS Ltd.